Showing 1 - 10 of 33
entry regulation and public ownership to explain the observed connectivity gap. …
Persistent link: https://www.econbiz.de/10011882497
Coordinating the timing and location of new production facilities is one of the challenges of liberalized power sectors. It is complicated by the presence of transmission bottlenecks, oligopolistic competition, and the unknown prospects of low-carbon technologies. The authors build a model...
Persistent link: https://www.econbiz.de/10011613836
Short-term auctions for access to entry terminals of the British gas-network appear to successfully allocate scarce resources and capture scarcity rent. Now long-term auctions are being introduced to guide future capacity expansion decisions. In our model the fraction of rights issued in the...
Persistent link: https://www.econbiz.de/10011591157
We aim to clarify the role of access charges under two-way network competition, employing a reduced-form approach. Retaining the key features of specific network competition models but imposing less structure, we analyze the impact of changes in access charges on linear and non-linear retail...
Persistent link: https://www.econbiz.de/10002521629
Persistent link: https://www.econbiz.de/10013479567
Persistent link: https://www.econbiz.de/10001599889
Persistent link: https://www.econbiz.de/10011991028
Persistent link: https://www.econbiz.de/10011775821
Persistent link: https://www.econbiz.de/10003087876
Persistent link: https://www.econbiz.de/10012887687