Showing 1 - 10 of 381
Coordinating the timing and location of new production facilities is one of the challenges of liberalized power sectors. It is complicated by the presence of transmission bottlenecks, oligopolistic competition, and the unknown prospects of low-carbon technologies. The authors build a model...
Persistent link: https://www.econbiz.de/10011613836
Persistent link: https://www.econbiz.de/10003847027
Persistent link: https://www.econbiz.de/10003406224
Persistent link: https://www.econbiz.de/10001717170
Persistent link: https://www.econbiz.de/10002024385
Persistent link: https://www.econbiz.de/10001650402
Persistent link: https://www.econbiz.de/10001599889
Persistent link: https://www.econbiz.de/10012887687
Short-term auctions for access to entry terminals of the British gas-network appear to successfully allocate scarce resources and capture scarcity rent. Now long-term auctions are being introduced to guide future capacity expansion decisions. In our model the fraction of rights issued in the...
Persistent link: https://www.econbiz.de/10011591157
Mitigation-Process Integrated Assessment Models (MP-IAMs) are used to analyze long-term transformation pathways of the energy system required to achieve stringent climate change mitigation targets. Due to their substantial temporal and spatial aggregation, IAMs cannot explicitly represent all...
Persistent link: https://www.econbiz.de/10011599310