Morocco charted its own distinctive path of power sector reform. It selectively introduced private sector participation …. The results have been impressive. Since 1990, Morocco has more than tripled its power supply, while growing renewable … through this selective approach to reform have come somewhat at the expense of the financial viability of the incumbent …
Persistent link: https://www.econbiz.de/10012632150
The challenge of power sector reform in the Arab Republic of Egypt has long been dominated by extremely high subsidies … pressure in 2014 when energy subsidies reached 6.8 percent of gross domestic product. Since then, the reform process has been …
Persistent link: https://www.econbiz.de/10012229762
ahead of other elements may limit the market effectiveness and even make subsequent reform steps more difficult …
Persistent link: https://www.econbiz.de/10012229789
potential macroeconomic impacts of an element of the power sector reform process that China started in 2015. It uses an energy …
Persistent link: https://www.econbiz.de/10012058932
Two successive waves of reform have fundamentally altered the structure and organization of Kenya's vibrant power …-beginning in 2002 and led by domestic reform champions-the thrust of first-wave reforms was continued, with the strengthening of …
Persistent link: https://www.econbiz.de/10012008392
benefits of reform from materializing until much later. The failed first attempt with the Bujagali Hydropower independent power … substantial improvements in operational efficiency and accelerating service coverage. Although the reform model was eventually …
Persistent link: https://www.econbiz.de/10012008394
Pakistan's power sector underwent a substantial, if protracted, reform process. Beginning with an independent power …
Persistent link: https://www.econbiz.de/10012022361
The Philippines power sector underwent a substantial and largely complete reform process. Following a severe shortage … National Power Corporation extremely burdensome, the Electric Power Industry Reform Act was passed in 2001. This was intended … at the wholesale and retail levels. Although the implementation of the full reform program took longer than originally …
Persistent link: https://www.econbiz.de/10012022385
Persistent link: https://www.econbiz.de/10012246133
This paper develops a number of approaches to power sector planning that respond to the uncertainties that Afghanistan faces. It aims to provide an alternative to the "predict then act" approach to planning, which will allow more robust decision making. The paper is divided into two parts: the...