Showing 1 - 10 of 26
The paper deals with yield curve construction methods using coupon bonds in Czech bond market. Generally, there are more possibilities how to approach this problem: bootstraping, splines, parametric functions. Due to the lack of tradable public bonds and due to the fact that existing bonds do...
Persistent link: https://www.econbiz.de/10005036582
Persistent link: https://www.econbiz.de/10000780567
Persistent link: https://www.econbiz.de/10000695236
Persistent link: https://www.econbiz.de/10009154543
Persistent link: https://www.econbiz.de/10009154666
Persistent link: https://www.econbiz.de/10001760333
Persistent link: https://www.econbiz.de/10000923685
Persistent link: https://www.econbiz.de/10000368770
This paper addresses the issue of project standby capacity optimization for capital budgeting. A detailed analysis and case study show that this is a particular real-option based situation, which solicits the use of statistical simulation. The method can be recommended as a useful heuristic for...
Persistent link: https://www.econbiz.de/10009398922