Showing 1 - 2 of 2
Persistent link: https://www.econbiz.de/10009376229
This paper addresses the issue of project standby capacity optimization for capital budgeting. A detailed analysis and case study show that this is a particular real-option based situation, which solicits the use of statistical simulation. The method can be recommended as a useful heuristic for...
Persistent link: https://www.econbiz.de/10009398922