Showing 1 - 10 of 243
This paper addresses the issue of project standby capacity optimization for capital budgeting. A detailed analysis and case study show that this is a particular real-option based situation, which solicits the use of statistical simulation. The method can be recommended as a useful heuristic for...
Persistent link: https://www.econbiz.de/10009398922
Persistent link: https://www.econbiz.de/10001225864
Persistent link: https://www.econbiz.de/10001746628
Persistent link: https://www.econbiz.de/10001746678
Persistent link: https://www.econbiz.de/10003417674
Persistent link: https://www.econbiz.de/10001063534
Persistent link: https://www.econbiz.de/10001063537
Persistent link: https://www.econbiz.de/10001076041
Persistent link: https://www.econbiz.de/10001045850
Persistent link: https://www.econbiz.de/10001051131