Showing 1 - 10 of 41
The Capacitated Facility Location Problem (CFLP) is a well-known combinatorial optimization problem with applications in distribution and production planning. A variety of lower bounds based on Lagrangean relaxation and subgradient optimization has been proposed for this problem. However, in...
Persistent link: https://www.econbiz.de/10011558775
A batch sequencing model with sequence-dependent setup-times and -costs is used to compare modelling and solving with two different general solvers. "Conceptual models" are implemented in the constraint propagation / logic programming language CHARME and solved with the PROLOG inference engine....
Persistent link: https://www.econbiz.de/10011613727
Two phases can be distinguished in academic course scheduling: In phase one lectures have to be assigned to professors, whereas in phase two the lectures have to be scheduled. Here we assume that the lectures are already assigned to professors, i.e. the first phase has been done. For the second...
Persistent link: https://www.econbiz.de/10011613738
We consider an extension of the classical resource-constrained project scheduling problem (RCPSP), which covers discrete resource-resource and time-resource tradeoffs. As a result a project scheduler is permitted to identify several alternatives or modes of accomplishment for each activity of...
Persistent link: https://www.econbiz.de/10011613753
This paper addresses an airport gate assignment problem with multiple objectives. The objectives are to minimize the number of ungated flights and the total passenger walking distances or connection times as well as to maximize the total gate assignment preferences. The problem examined is an...
Persistent link: https://www.econbiz.de/10011799801
Persistent link: https://www.econbiz.de/10003728973
Persistent link: https://www.econbiz.de/10002750706
Persistent link: https://www.econbiz.de/10001481304
Persistent link: https://www.econbiz.de/10001628106
Persistent link: https://www.econbiz.de/10000902966