Showing 1 - 3 of 3
A mixed-model assembly line requires the solution of a short-term sequencing problem which decides on the succession of different models launched down the line. A famous solution approach stemming from the Toyota Production System is the so called Level Scheduling, which aims at distributing the...
Persistent link: https://www.econbiz.de/10005785957
Assembly line balancing problems (ALBPs) arise whenever an assembly line is configured, redesigned or adjusted. An ALBP consists of distributing the total workload for manufacturing products among the work stations along the line. On the one hand, research has focussed on developing effective...
Persistent link: https://www.econbiz.de/10005785965
Assembly line balancing problems (ALBP) consist of distributing the total workload for manufacturing any unit of the products to be assembled among the work stations along a manufacturing line as used in the automotive or the electronics industries. Usually, it is assumed that the production...
Persistent link: https://www.econbiz.de/10005785974