Showing 1 - 10 of 27,815
The regulatory lag- the number of years between price reviews - determines the power of a price-cap contract. Around the world, most price-cap contracts have a regulatory lag of four to five years. However, this practice doesn’t seem to be based on any optimality consideration. Schmalensee...
Persistent link: https://www.econbiz.de/10014067221
Prezenta lucrare abordează un segment al problematicii complexe cu privire la procesul de luare a deciziilor. Odată cu dezvoltarea tehnologiilor informațioanle s-au dezvoltat și implementat sistemele suport de decizie (DSS) care au devenit din ce în ce mai performante și au fost...
Persistent link: https://www.econbiz.de/10015270031
We study the gap between the state pension provided by the Italian pension system pre-Dini reform and post-Dini reform. The goal is to fill the gap between the old and the new pension by joining a defined contribution pension scheme and adopting an optimal investment strategy that is...
Persistent link: https://www.econbiz.de/10011866511
This paper relates recursive utility in continuous time to its discrete-time origins and provides a rigorous and intuitive alternative to a heuristic approach presented in [Duffie, Epstein 1992], who formally define recursive utility in continuous time via backward stochastic differential...
Persistent link: https://www.econbiz.de/10010271454
We study the gap between the state pension provided by the Italian pension system pre-Dini reform and post-Dini reform. The goal is to fill the gap between the old and the new pension by joining a defined contribution pension scheme and adopting an optimal investment strategy that is...
Persistent link: https://www.econbiz.de/10011996606
The key element in the tension between those who believe climate change is an issue and those who do not is essentially the question of whether we are merely in a long period of shock-induced above average temperatures or if we have led to this increase in temperatures by anthropogenic carbon...
Persistent link: https://www.econbiz.de/10005784554
In this contribution we propose an approach to solve a multistage stochastic programming problem which allows us to obtain a time and nodal decomposition of the original problem. This double decomposition is achieved applying a discrete time optimal control formulation to the original stochastic...
Persistent link: https://www.econbiz.de/10014041969
Information delays exist when the most recent inventory information available to the Inventory Manager (IM) is dated. In other words, the IM observes only the inventory level that belongs to an earlier period. Such situations are not uncommon, and they arise when it takes a while to process the...
Persistent link: https://www.econbiz.de/10014220377
Dynamic programming is the essential tool in dynamic economic analysis. Problems such as portfolio allocation for individuals and optimal economic growth are typical examples. Numerical methods typically approximate the value function. Recent work has focused on making numerical methods more...
Persistent link: https://www.econbiz.de/10014025714
This paper introduces a flexible method based on dynamic programming to calculate the quantitative value of any approach to managing the innovation process. The quantification lets managers precisely compare the values of different approaches, and so identify those that are optimised for their...
Persistent link: https://www.econbiz.de/10014030500