Showing 1 - 10 of 171
In this paper, a problem generator for the Two-Dimensional Rectangular Single Large Object Placement Problem is presented. The parameters defining this problem are identified and described. The fea-tures of the problem generator are pointed out, and it is shown how the program can be used for...
Persistent link: https://www.econbiz.de/10005488138
Persistent link: https://www.econbiz.de/10003792758
Persistent link: https://www.econbiz.de/10003840618
In manual order picking systems, order pickers walk or drive through a distribution warehouse in order to collect items which are requested by (internal or external) customers. In order to perform these operations effciently, it is usually required that customer orders are combined into (more...
Persistent link: https://www.econbiz.de/10008458171
In manual order picking systems, order pickers walk or ride through a distribution warehouse in order to collect items requested by (internal or external) customers. In order to perform these operations efficiently, it is usually required that customer orders are combined into (more substantial)...
Persistent link: https://www.econbiz.de/10008515958
In this paper the authors present a case study from the wood-processing industry. It focuses on a cutting process in which material from stock is cut down in order to provide the items required by the customers in the desired qualities, sizes, and quantities. In particular, two aspects make this...
Persistent link: https://www.econbiz.de/10005488137
Persistent link: https://www.econbiz.de/10009659865
Persistent link: https://www.econbiz.de/10011483296
Persistent link: https://www.econbiz.de/10003733714
The traditional way of procurement, using long-term contract and capacity reservation, is competing with the escalating global spot market. Considering the variability of the spot prices, the flexibility of combined sourcing can be used to benefit from occasional low short-term spot price levels...
Persistent link: https://www.econbiz.de/10005342015