Showing 1 - 10 of 192
A mixed-model assembly line requires the solution of a short-term sequencing prob-lem, which decides on the succession of different models launched down the line.A famous solution approach stemming from the Toyota Production System is theso-called Level Scheduling (LS), which aims to distribute...
Persistent link: https://www.econbiz.de/10005870689
The mixed-model sequencing problem is to sequence different product models launched downan assembly line, so that work overload at the stations induced by direct succession of multiplelabor-intensive models is avoided. As a concept of clearing overload situations, especiallyapplied by Western...
Persistent link: https://www.econbiz.de/10005870690
A mixed-model assembly line requires the solution of a short-term sequencing prob-lem which decides on the succession of different models launched down the line. Afamous solution approach stemming from the Toyota Production System is the socalled Level Scheduling, which aims at distributing the...
Persistent link: https://www.econbiz.de/10005870695
Assembly line balancing problems (ALBP) consist of distributing the total workload for manufacturing any unit of the productsto be assembled among the work stations along a manufacturing line as used in the automotive or the electronics industries.Usually, it is assumed in research papers that,...
Persistent link: https://www.econbiz.de/10005870709
The generation of leveled production schedules is of high impor-tance for mixed-model assembly lines whose parts and materials are suppliedjust-in-time by multi-level production processes. The Output Rate Variatonproblem is the standard mathematical representation of this complex levelscheduling...
Persistent link: https://www.econbiz.de/10005870722
Mixed-model assembly lines are widely used in a range of production settings,such as the nal assembly of the automotive and electronics industries,where they are applied to mass-produce standardized commodities. One ofthe greatest challenges when installing and reconguring these lines is thevast...
Persistent link: https://www.econbiz.de/10005870723
A production system which consists of a number of parallel assembly lines is considered. Oneach line a certain product is manufactured observing a common cycle time. By arranging thelines in a favourable manner, it is possible to increase efficiency of the production system bycombining stations...
Persistent link: https://www.econbiz.de/10005870726
Assembly line balancing problems (ALBP) consist of distributing the total workload for manufacturingany unit of the products to be assembled among the work stations along a manufacturing line as used inthe automotive or the electronics industries. Usually, it is assumed that the production...
Persistent link: https://www.econbiz.de/10005870774
Assembly line balancing problems (ALBPs) arise whenever an assembly line is configured, redesignedor adjusted. An ALBP consists of distributing the total workload for manufacturingproducts among the work stations along the line. On the one hand, research has focussed on developingeffective and...
Persistent link: https://www.econbiz.de/10005870775
Most approaches to multi-project scheduling are based on the assumption that resources can betransferred between projects without any expense in time and cost. As this assumption often isnot realistic, we generalise the multi-project scheduling problem (RCMPSP) by additionallyincluding transfer...
Persistent link: https://www.econbiz.de/10005870777