Showing 1 - 10 of 225
Persistent link: https://www.econbiz.de/10009126317
Persistent link: https://www.econbiz.de/10008701608
Persistent link: https://www.econbiz.de/10008991913
Persistent link: https://www.econbiz.de/10009891101
Purpose – The construction industry in Australia is characterised by a long work‐hours culture, with conditions that make it difficult for staff to balance their work and non‐work lives. The objective of this paper is to measure the success of a work‐place intervention designed to...
Persistent link: https://www.econbiz.de/10014786348
Purpose – The purpose of this paper is to provide a labour process theory interpretation of four case studies within the Australian construction industry. In each case study a working time intervention (a shift to a five‐day working week from the industry standard six days) was implemented...
Persistent link: https://www.econbiz.de/10014974177
Persistent link: https://www.econbiz.de/10003855987
Persistent link: https://www.econbiz.de/10009011679
Persistent link: https://www.econbiz.de/10003803919
Persistent link: https://www.econbiz.de/10009046782