Showing 1 - 10 of 22
In ecological and environmental sampling the quantification of units is either difficult or overly demanding in terms of the time, money, workload, it requires. For this reason efficient and cost-effective sampling methods need to be devised for data collecting. The most commonly used method for...
Persistent link: https://www.econbiz.de/10013444103
In this research work we introduce a new sampling design, namely a two-stage cluster sampling, where probability proportional to size with replacement is used in the first stage unit and ranked set sampling in the second in order to address the issue of marked variability in the sizes of...
Persistent link: https://www.econbiz.de/10013444154
Persistent link: https://www.econbiz.de/10011392888
In ecological and environmental sampling the quantification of units is either difficult or overly demanding in terms of the time, money, workload, it requires. For this reason efficient and cost-effective sampling methods need to be devised for data collecting. The most commonly used method for...
Persistent link: https://www.econbiz.de/10012664738
Persistent link: https://www.econbiz.de/10012256683
In this research work we introduce a new sampling design, namely a two-stage cluster sampling, where probability proportional to size with replacement is used in the first stage unit and ranked set sampling in the second in order to address the issue of marked variability in the sizes of...
Persistent link: https://www.econbiz.de/10013428875
This paper surveys the last decade of micro-economic research using time-use data. Focusing on the household production model, time-use as an investment activity, and the distribution of extended income, issues of data collection, measurement errors, model specification and estimation as well as...
Persistent link: https://www.econbiz.de/10010321806
The paper focuses on the estimation of the euro area output gap. We construct model-averaged measures of the output gap in order to cope with both model uncertainty and parameter instability that are inherent to trend-cycle decomposition models of GDP. We first estimate nine models of...
Persistent link: https://www.econbiz.de/10011605430
The labour force surveys (LFSs) on all Eurostat countries underwent a substantial redesign in January 2021. To ensure coherent labour market time series for the main indicators in the Norwegian LFS, we model the impact of the redesign. We use a state-space model that takes explicit account of...
Persistent link: https://www.econbiz.de/10013480208
The forecasting of time series in goods management systems causes various problems that we identify and indicate possible solutions. The implementation of auxiliary information like promotional activities or calendar effects in forecasts using ARMA models and exponential smoothing methods may be...
Persistent link: https://www.econbiz.de/10010316575