Showing 1 - 10 of 656,901
This paper presents an asymptotic analysis of hierarchical production planning in a manufacturing system with two tandem machines that are subject to breakdown and repair. Since the number of parts in the buffer between the two machines needs to be non-negative, the problem is inherently a state...
Persistent link: https://www.econbiz.de/10012835287
efficient algorithm with respect to a succinct encoding of the problem instances is proposed. The algorithm is an improvement of … algorithm has the potential of extension to job shops with parallel machines …
Persistent link: https://www.econbiz.de/10012746789
This paper presents an asymptotic analysis of hierarchical production planning in a manufacturing system with two tandem machines that are subject to breakdown and repair. The system produces a single product, whose rate of demand over time is given to be constant. The problem is formulated as a...
Persistent link: https://www.econbiz.de/10014046910
production costs. The paper develops an efficient forward dynamic programming algorithm and uses it to develop managerial …
Persistent link: https://www.econbiz.de/10012838802
cyclic conveyor. The minimization of finish time is considered as the optimization criterion. An optimal algorithm is …
Persistent link: https://www.econbiz.de/10012834910
This paper describes a flow rate control policy to manage the production of a wafer fabrication facility. The policy is derived by formulating and solving a stochastic control problem. The results are then used to develop two sets of production control rules. The first one adjusts the lot...
Persistent link: https://www.econbiz.de/10012834918
The optimal production control problem of deterministic pull flow lines with multiple part types is considered in this paper. The last machine is assumed to be the bottleneck. The objective is to minimize the total inventory and backlog costs over time. We give an optimal production policy and...
Persistent link: https://www.econbiz.de/10012835295
This paper presents an asymptotic analysis of hierarchical production planning in a manufacturing system with two tandem machines that are subject to breakdown and repair. The buffer between the two machines is assumed finite. Therefore, the number of parts in that buffer needs to be...
Persistent link: https://www.econbiz.de/10014098555
genetic algorithm (TCGA). We first compare the performances of the proposed TCGA with the optimal solution obtained by CPLEX … withthe classic genetic algorithm (GA) and the shortest processing time (SPT) rule through numerical experiments. The results …
Persistent link: https://www.econbiz.de/10014100568
We consider a problem of controlling the production rate of a single machine, single product, stochastic manufacturing system in order to minimize the total discounted inventory /backlog costs. The demand has two components: one is deterministic with constant rate d and the other is stochastic...
Persistent link: https://www.econbiz.de/10012835286