Showing 1 - 6 of 6
Persistent link: https://www.econbiz.de/10005329847
Persistent link: https://www.econbiz.de/10006641864
Persistent link: https://www.econbiz.de/10008891287
Persistent link: https://www.econbiz.de/10010054467
In the scheduling literature, it is often assumed that jobs arrive either simultaneously or individually. However, this assumption is invalid in most practical situations because jobs usually arrive in batches, e.g., the final testing house in the manufacturing of semiconductor. The concept of...
Persistent link: https://www.econbiz.de/10008521497
This paper considers a real-life identical parallel scheduling problem originating from the manufacturing plant producing polyvinyl chloride leather products. In the considered scheduling problem, each job has some attributes and each attribute has several different levels. Because there is at...
Persistent link: https://www.econbiz.de/10010776686