Showing 1 - 10 of 39
Persistent link: https://www.econbiz.de/10007750180
Since the workload of a manufacturing system changes over time, the material handling equipment used in the facility will be idle at certain time intervals to avoid system overload. In this context, a relevant control problem in operating an automated guided vehicle (AGV) system is where to...
Persistent link: https://www.econbiz.de/10005337805
Persistent link: https://www.econbiz.de/10007895436
This theoretical paper presents a new construction algorithm for sparse 1-fault tolerant minimal broadcast networks (1-FTMBNs). To construct a large 1-FTMBN with the algorithm, identical nodes in copies of a broadcast network that is not fault tolerant are connected according to the edge...
Persistent link: https://www.econbiz.de/10005050691
Persistent link: https://www.econbiz.de/10005287573
We develop a model for a one-time special purchasing opportunity where there is uncertainty with respect to the materialization of the discounted purchasing offer. Our model captures the phenomenon of an anticipated future event that may or may not lead to a discounted offer. We analyze the...
Persistent link: https://www.econbiz.de/10011264323
Persistent link: https://www.econbiz.de/10005240071
Persistent link: https://www.econbiz.de/10005329716
Persistent link: https://www.econbiz.de/10005337997
Persistent link: https://www.econbiz.de/10007279875