Showing 1 - 10 of 49
Persistent link: https://www.econbiz.de/10003651892
Persistent link: https://www.econbiz.de/10003651922
Persistent link: https://www.econbiz.de/10002643920
Persistent link: https://www.econbiz.de/10003651913
Persistent link: https://www.econbiz.de/10002643898
Persistent link: https://www.econbiz.de/10005330055
Persistent link: https://www.econbiz.de/10005253460
Persistent link: https://www.econbiz.de/10005253658
We consider the problem of minimizing the expected makespan of n jobs with independent exponentially distributed processing times on two parallel machines, under resource constraints. Job j has expected processing time 1/\mu <sub>j</sub> and requires throughout its processing an amount r<sub>j</sub> of a resource; the...
Persistent link: https://www.econbiz.de/10009209399
We address the scheduling of operations in a robotic cell that produces multiple part-types. The objective is to obtain a cyclic schedule--a sequence of robot moves and an ordering of the parts--that minimizes the long-run average time to produce a part or, equivalently, maximizes the...
Persistent link: https://www.econbiz.de/10009218722