Showing 1 - 10 of 961
the end of the project under the constraints of available cash. The optimization of the integrated models was demonstrated …
Persistent link: https://www.econbiz.de/10008466623
An automated model is developed to support the optimization of the planning and scheduling of repetitive construction projects. The model provides the capability of optimizing two important objectives commonly sought in scheduling repetitive construction projects: minimizing project duration;...
Persistent link: https://www.econbiz.de/10008466643
The line of balance (LOB) method is not widely used in the construction industry even though it has distinct advantages in repetitive construction projects. Attempts were made in the past to develop LOB systems but no system has met with universal acceptance because of a multitude of problems....
Persistent link: https://www.econbiz.de/10005445661
Scheduling linear repetitive construction projects, such as highways and pipelines, poses unique challenges due to maintaining crew work continuity. An efficient method is presented, developed to accelerate the delivery of this class of projects so as to meet a specified deadline with least...
Persistent link: https://www.econbiz.de/10005269104
A practical object-oriented model for the planning and control of housing construction is presented that can generate efficient schedules and determine the time and cost performance of a housing project at three levels: (i) entire project, (ii) particular housing unit and (iii) an individual...
Persistent link: https://www.econbiz.de/10005633055
O objetivo deste artigo é analisar os ganhos de produtividade gerados pelo processo de aprendizado das firmas brasileiras no comércio internacional. Usando o estimador Abadie-Imbens, foram avaliadas as diferenças de produtividade entre firmas exportadoras e não exportadoras, em diferentes...
Persistent link: https://www.econbiz.de/10010965643
scarcity effect implies a carbon tax trajectory which is also unusual in this kind of ceiling models, its increasing part been …
Persistent link: https://www.econbiz.de/10010905660
demonstrates the optimal properties of the proposed models, develops a search algorithm for obtaining optimal solutions, and … conducts a numerical study to seek structural and quantitative insights into the structure of the proposed models. In addition …
Persistent link: https://www.econbiz.de/10010906465
In the course of training farmer college students, there have been a number of problems facing the modern distance education based on digital learning environment, such as weak learning adaptability and ability of farmers and diverse learning needs. Using the empirical methods of questionnaire...
Persistent link: https://www.econbiz.de/10010918963
We consider a single-machine common due-window assignment scheduling problem, in which the processing time of a job is a function of its position in a sequence and its resource allocation. The window location and size, along with the associated job schedule that minimizes a certain cost...
Persistent link: https://www.econbiz.de/10010940522