Showing 1 - 10 of 603
Persistent link: https://www.econbiz.de/10004113359
An organization needs to be ready before implementing a complex enterprise resource planning (ERP) system. To achieve this aim, organization has to address two questions: (1) “is the organization sufficiently ready to accept an ERP system” and (2) “what is the most cost effective plan for...
Persistent link: https://www.econbiz.de/10011193824
Persistent link: https://www.econbiz.de/10004300517
Persistent link: https://www.econbiz.de/10004346131
Concurrent design can reduce the time required to develop new products and redesign old ones. In contrast to the conventional approach, in which the product design is (nearly) completed before it is "thrown over the wall" to the process design group, concurrent design for manufacturability, as...
Persistent link: https://www.econbiz.de/10009209302
We examine whether cooperative planning and uncertainty affect the magnitude of rework in concurrent engineering projects with upstream and downstream operations, and explore the impact of such rework on project delays. Using survey data from a sample of 120 business process (BP) redesign and...
Persistent link: https://www.econbiz.de/10009218447
Persistent link: https://www.econbiz.de/10000107230
Persistent link: https://www.econbiz.de/10009268518
Persistent link: https://www.econbiz.de/10003999484
Persistent link: https://www.econbiz.de/10004129887