Showing 1 - 10 of 16
Persistent link: https://www.econbiz.de/10008349364
Persistent link: https://www.econbiz.de/10007895310
Persistent link: https://www.econbiz.de/10010015436
Persistent link: https://www.econbiz.de/10007795279
Persistent link: https://www.econbiz.de/10008898898
Persistent link: https://www.econbiz.de/10008483400
In this paper we consider the programming of job rotation in the assembly line worker assignment and balancing problem. The motivation for this study comes from the designing of assembly lines in sheltered work centers for the disabled, where workers have different task execution times. In this...
Persistent link: https://www.econbiz.de/10005066898
In this article, we introduce two new variants of the Assembly Line Worker Assignment and Balancing Problem (ALWABP) that allow parallelization of and collaboration between heterogeneous workers. These new approaches suppose an additional level of complexity in the Line Design and Assignment...
Persistent link: https://www.econbiz.de/10011043363
We propose an extension to the flow shop scheduling problem named Heterogeneous Flow Shop Scheduling Problem (Het-FSSP), where two simultaneous issues have to be resolved: finding the best worker assignment to the workstations, and solving the corresponding scheduling problem. This problem is...
Persistent link: https://www.econbiz.de/10011097742
Persistent link: https://www.econbiz.de/10008283529