Showing 1 - 10 of 24
In this study, we consider a Resource Investment Problem with time/resource trade-offs in project networks. We assume that there is a single renewable resource and the processing requirement of an activity can be reduced by investing extra resources. Our aim is to minimize the maximum resource...
Persistent link: https://www.econbiz.de/10010861261
Persistent link: https://www.econbiz.de/10005236867
Persistent link: https://www.econbiz.de/10005240757
In this study, we address a part-type sequencing and tool switching problem arising in Flexible Manufacturing Systems. We consider the single machine problem of minimizing the number of tool switching instants. We propose two tabu search approaches to find high-quality solutions. Our...
Persistent link: https://www.econbiz.de/10005311830
Persistent link: https://www.econbiz.de/10005330040
Persistent link: https://www.econbiz.de/10005339585
Persistent link: https://www.econbiz.de/10005347525
Persistent link: https://www.econbiz.de/10005158351
Persistent link: https://www.econbiz.de/10006159730
Persistent link: https://www.econbiz.de/10006194680