Showing 1 - 10 of 21
This study deals with the problem of scheduling jobs on a single machine to minimize the mean absolute deviation of the job completion time about a large common due window subject to the maximum tardiness constraint. Using the well-known three-field notation, the problem is identified as...
Persistent link: https://www.econbiz.de/10009292675
In the scheduling literature, it is often assumed that jobs arrive either simultaneously or individually. However, this assumption is invalid in most practical situations because jobs usually arrive in batches, e.g., the final testing house in the manufacturing of semiconductor. The concept of...
Persistent link: https://www.econbiz.de/10008521497
This study addresses a two-stage flowshop with a batch machine in stage 1 and a discrete machine in stage 2, subject to the constraint that the input buffer of the discrete machine can only host limited number of jobs. The batch machine processes a batch of jobs simultaneously, and the discrete...
Persistent link: https://www.econbiz.de/10008490591
Persistent link: https://www.econbiz.de/10005347178
Persistent link: https://www.econbiz.de/10005339558
Scheduling parallel machines with resource-dependent processing time is common in many operations management, especially in breaking processing bottlenecks in the Theory of Constraint and lean production. This study considers the problem of scheduling a set of jobs on parallel machines when the...
Persistent link: https://www.econbiz.de/10005339704
Persistent link: https://www.econbiz.de/10005937202
Persistent link: https://www.econbiz.de/10010062147
Persistent link: https://www.econbiz.de/10010108153
Persistent link: https://www.econbiz.de/10008172905