Showing 1 - 10 of 19
The two-machine flowshop environment with sequence-independent setup times has been intensely investigated both from theoretical and practical perspectives in the scheduling literature. Nevertheless, very scant attention has been devoted to deriving effective lower bounding strategies. In this...
Persistent link: https://www.econbiz.de/10010682482
Persistent link: https://www.econbiz.de/10010142539
The Team Orienteering Problem (TOP) is a particular vehicle routing problem in which the aim is to maximize the profit gained from visiting customers without exceeding a travel cost/time limit. This paper proposes a new and fast evaluation process for TOP based on an interval graph model and a...
Persistent link: https://www.econbiz.de/10010666137
The problem of scheduling a task system with communication delays on multiprocessor systems is known to be NP-hard in its general form as well as many restricted cases even on an unlimited number of processors. In this paper, we study the problem of determining an upper bound on the minimum...
Persistent link: https://www.econbiz.de/10010847688
The problem of scheduling a task system with communication delays on multiprocessor systems is known to be NP-hard in its general form as well as many restricted cases even on an unlimited number of processors. In this paper, we study the problem of determining an upper bound on the minimum...
Persistent link: https://www.econbiz.de/10010950109
This study investigates an optimization-based heuristic for the robotic cell problem. This problem arises in automated cells and is a complex flow shop problem with a single transportation robot and a blocking constraint. We propose an approximate decomposition algorithm. The proposed approach...
Persistent link: https://www.econbiz.de/10008483128
Persistent link: https://www.econbiz.de/10005329614
In this paper we address the Preemptive Resource Constrained Project Scheduling Problem (PRCPSP). PRCPSP requires a partially ordered set of activities to be scheduled using limited renewable resources such that any activity can be interrupted and later resumed without penalty. The objective is...
Persistent link: https://www.econbiz.de/10011209345
Persistent link: https://www.econbiz.de/10010082481
Persistent link: https://www.econbiz.de/10010109323