Sarkar, Biswajit; Moon, Ilkyeong - In: International Journal of Production Economics 155 (2014) C, pp. 204-213
This paper illustrates the relationship between quality improvement, reorder point, and lead time, as affected by backorder rate, in an imperfect production process. To reduce the total system cost by optimizing the setup cost, lot size, lead time, reorder point, and process quality parameter...