Showing 1 - 2 of 2
(CNE) and other Governmental agencies. Hence, the study describes the new regulatory scheme for grid connected photovoltaic …-connected photovoltaic systems in Spain: Performance analysis of the period 1998–2008. Renewable and Sustainable Energy Reviews 2010 …
Persistent link: https://www.econbiz.de/10011049349
A methodology for calculating the overrun cost to the Spanish electricity system caused by the large overshoot of the PV power targets under the RD 661/2007 is here presented. The elements influencing the cost have been identified, which has allowed proposing different scenarios for its possible...
Persistent link: https://www.econbiz.de/10011040365