This report estimates the local economic impacts that could be anticipated from the development of a 100 megawatt (MW) geothermal power plant in eastern Whatcom County, Washington, near Mt. Baker, as shown in Figure 1. The study was commissioned by the Bonneville Power Administration to quantify...
Persistent link: https://www.econbiz.de/10009436005
This report estimates the local economic impacts that could be anticipated from the development of a 100 megawatt (MW) geothermal power plant in eastern Skamania County, Washington, near Mt. Adams, as shown in Figure 1. The study was commissioned by the Bonneville Power Administration to...
Persistent link: https://www.econbiz.de/10009436006
The Community-Level Impacts Projection System includes a set of techniques for providing detailed advance information required for rational planning. The computerized system generates reports which enable the user: to describe the energy development activity in terms of its employment demands...
Persistent link: https://www.econbiz.de/10009436029