Showing 1 - 2 of 2
The problem of scheduling the production of new and recoverable defective items of the same product manufactured on the same facility is studied. Items are processed in batches. Each batch comprises two sub-batches processed consecutively. In the first sub-batch, all the items are newly...
Persistent link: https://www.econbiz.de/10005240354
Persistent link: https://www.econbiz.de/10007984422