Showing 1 - 10 of 42
Persistent link: https://www.econbiz.de/10003710733
Persistent link: https://www.econbiz.de/10013546097
Persistent link: https://www.econbiz.de/10011436780
Persistent link: https://www.econbiz.de/10008841258
Persistent link: https://www.econbiz.de/10003710730
Persistent link: https://www.econbiz.de/10013206922
Persistent link: https://www.econbiz.de/10012003683
Persistent link: https://www.econbiz.de/10011778065
The generation of leveled production schedules is of high impor-tance for mixed-model assembly lines whose parts and materials are suppliedjust-in-time by multi-level production processes. The Output Rate Variatonproblem is the standard mathematical representation of this complex levelscheduling...
Persistent link: https://www.econbiz.de/10005870722
Transshipment yards, where gantry cranes allow for an ecient transshipment of containersbetween different freight trains, are important entities in modern railway systems andfacilitate the general shift from point-to-point transport to hub-and-spoke railway systems.Modern rail-rail transshipment...
Persistent link: https://www.econbiz.de/10005870732