Showing 1 - 8 of 8
In May 2015, the Flow-Based Market Coupling (FBMC) model replaced the Available Transfer Capacity (ATC) model in Central Western Europe to determine the power transfer among bidding zones in the day-ahead market. It might be easier to change the bidding zone configuration in the FBMC model than...
Persistent link: https://www.econbiz.de/10014110525
In May 2015, the Flow-Based Market Coupling (FBMC) model replaced the Available Transfer Capacity (ATC) model in Central Western Europe to determine the power transfers between countries or price areas. The FBMC model aims to enhance market integration and to better monitor the physical power...
Persistent link: https://www.econbiz.de/10014110526
Persistent link: https://www.econbiz.de/10010373281
Persistent link: https://www.econbiz.de/10011391629
Persistent link: https://www.econbiz.de/10011950141
Persistent link: https://www.econbiz.de/10011950145
Persistent link: https://www.econbiz.de/10011802123
This paper investigates a pricing model for an electricity market with a hybrid congestion management method, i.e. part of the system applies a nodal pricing scheme and the rest applies a zonal pricing scheme. The model clears the zonal and nodal pricing areas simultaneously. The nodal pricing...
Persistent link: https://www.econbiz.de/10011098229