Showing 1 - 3 of 3
Persistent link: https://www.econbiz.de/10009324670
In general, solving Global Optimization (GO) problems by Branch-and-Bound (B&B) requires a huge computational capacity. Parallel execution is used to speed up the computing time. As in this type of algorithms, the foreseen computational workload (number of nodes in the B&B tree) changes...
Persistent link: https://www.econbiz.de/10010994040
Interval branch-and-bound (B&B) algorithms are powerful methods which look for guaranteed solutions of global optimisation problems. The computational effort needed to reach this aim, increases exponentially with the problem dimension in the worst case. For separable functions this effort is...
Persistent link: https://www.econbiz.de/10010994104