Showing 1 - 10 of 11
Persistent link: https://www.econbiz.de/10011430763
Persistent link: https://www.econbiz.de/10011415030
Persistent link: https://www.econbiz.de/10011476086
Persistent link: https://www.econbiz.de/10011623524
This study presents an extension of the Gaussian process regression model for multiple-input multiple-output forecasting. This approach allows modelling the cross-dependencies between a given set of input variables and generating a vectorial prediction. Making use of the existing correlations in...
Persistent link: https://www.econbiz.de/10011537542
Persistent link: https://www.econbiz.de/10010412358
This study presents a multiple-input multiple-output (MIMO) approach for multi-step-ahead time series prediction with a Gaussian process regression (GPR) model. We assess the forecasting performance of the GPR model with respect to several neural network architectures. The MIMO setting allows...
Persistent link: https://www.econbiz.de/10012959523
This paper aims to compare the performance of different Artificial Neural Networks techniques for tourist demand forecasting. We test the forecasting accuracy of three different types of architectures: a multi-layer perceptron, a radial basis function and an Elman network. We also evaluate the...
Persistent link: https://www.econbiz.de/10013045968
This study compares the performance of different Artificial Neural Networks models for tourist demand forecasting in a multiple-output framework. We test the forecasting accuracy of three different types of architectures: a multi-layer perceptron network, a radial basis function network and an...
Persistent link: https://www.econbiz.de/10013045969
The objective of this paper is to compare different forecasting methods for the short run forecasting of Business Survey Indicators. We compare the forecasting accuracy of Artificial Neural Networks (ANN) vs. three different time series models: autoregressions (AR), autoregressive integrated...
Persistent link: https://www.econbiz.de/10013045972