Showing 1 - 10 of 27
In Italy and in many EU countries, the last decade was characterized by a large development of distributed generation power plants. Their presence determined new critical issues for the design and management of the overall energy system and the electric grid due to the presence of discontinuous...
Persistent link: https://www.econbiz.de/10011548109
We analyze the optimal investment strategy of a monopolist which has subscribed a concession contract to provide a public utility, i.e. water service. We present a strategic model in which a monopolist chooses both the timing of the investment and the capacity. We focus not only on the value of...
Persistent link: https://www.econbiz.de/10011607043
Persistent link: https://www.econbiz.de/10002503458
This paper considers the supplier's strategic delivery lead time in a public procurement setting as the result of the firm's opportunistic behaviour on the optimal investment timing. In the presence of uncertainty on construction costs, we model the supplier's option to defer the contract's...
Persistent link: https://www.econbiz.de/10009634269
We provide a general framework in which to determine the optimal penalty fee inducing the contractor to respect the contracted delivery date in public procurement contracts (PPCs). We do this by developing a real option model that enables us to investigate the contractor's value of investment...
Persistent link: https://www.econbiz.de/10008823913
Persistent link: https://www.econbiz.de/10003808074
Persistent link: https://www.econbiz.de/10009790019
Persistent link: https://www.econbiz.de/10013202034
<i> La valutazione della flessibilità nel servizio idrico integrato </i> (di Chiara D'Alpaos e Michele Moretto) - ABSTRACT: We analyse the optimal investment strategy of a monopolist firm, which has subscribed some sort of concession contract to provide a public utility, i.e. water service. We present...
Persistent link: https://www.econbiz.de/10011066407
In Italy and in many EU countries, the last decade was characterized by a large development of distributed generation power plants. Their presence determined new critical issues for the design and management of the overall energy system and the electric grid due to the presence of discontinuous...
Persistent link: https://www.econbiz.de/10011586852