Persistent link: https://www.econbiz.de/10008163737
The resource-constrained project scheduling problem (RCPSP) has been extensively investigated during the past decades. Due to its strongly NP-hard status and the need for solving large realistic project instances, the recent focus has shifted from exact optimisation procedures to (meta-)...
Persistent link: https://www.econbiz.de/10005464791
The well-known resource-constrained project scheduling problem (RCPSP) schedules project activities within the precedence and renewable resource constraints while minimizing the total lead-time of the project. The basic problem description assumes non-pre-emptive activities with fixed durations,...
Persistent link: https://www.econbiz.de/10005464809
We present a finite capacity production scheduling algorithm for an integrated steel company located in Belgium. This multiple-objective optimization model takes various case-specific constraints into account and consists of two steps. A machine assignment step determines the routing of an...
Persistent link: https://www.econbiz.de/10005607038
Resource-constrained project scheduling with activity pre-emption assumes that activities are allowed to be interrupted and restarted later in the schedule at no extra cost. In the current paper, we extend this pre-emptive scheduling problem with setup times between activity interruptions and...
Persistent link: https://www.econbiz.de/10005607039