Showing 1 - 10 of 70
Persistent link: https://www.econbiz.de/10012316111
Persistent link: https://www.econbiz.de/10003617141
Persistent link: https://www.econbiz.de/10009243330
Persistent link: https://www.econbiz.de/10011436853
The classical, deterministic resource-constrained project scheduling problem has been the subject of a great deal of research during the previous decades. This is not surprising given the high practical relevance of this scheduling problem. Nevertheless, extensions are needed to be better able...
Persistent link: https://www.econbiz.de/10012725523
This paper describes new heuristic reactive project scheduling procedures that may be used to repair resource-constrained roject baseline schedules that suer from multiple activity duration disruptions during project execution.The objective is to minimize the deviations between the baseline...
Persistent link: https://www.econbiz.de/10014057657
Persistent link: https://www.econbiz.de/10010357810
Persistent link: https://www.econbiz.de/10012265300
Persistent link: https://www.econbiz.de/10000835987
Persistent link: https://www.econbiz.de/10000841684