Showing 11 - 20 of 38
We consider an extension of the classical resource-constrained project scheduling problem (RCPSP), which covers discrete resource-resource and time-resource tradeoffs. As a result a project scheduler is permitted to identify several alternatives or modes of accomplishment for each activity of...
Persistent link: https://www.econbiz.de/10011743239
Persistent link: https://www.econbiz.de/10011806893
Persistent link: https://www.econbiz.de/10011806901
Persistent link: https://www.econbiz.de/10011806933
Persistent link: https://www.econbiz.de/10011806934
Persistent link: https://www.econbiz.de/10011806935
Persistent link: https://www.econbiz.de/10011806937
This paper addresses an airport gate assignment problem with multiple objectives. The objectives are to minimize the number of ungated flights and the total passenger walking distances or connection times as well as to maximize the total gate assignment preferences. The problem examined is an...
Persistent link: https://www.econbiz.de/10011808664
This contribution summarizes recent work in the field of lot sizing and scheduling. The objective is not to give a comprehensive literature survey, but to explain differences of formal models and to provide some first readings recommendations. Our focus is on capacitated, dynamic, and...
Persistent link: https://www.econbiz.de/10011808819
Persistent link: https://www.econbiz.de/10001628106