Showing 1 - 3 of 3
Two classes of one machine sequencing situations are considered in which each job corresponds to exactly one player but a player may have more than one job to be processed, so called RP(repeated player) sequencing situations.In max-RP sequencing situations it is assumed that each player's cost...
Persistent link: https://www.econbiz.de/10011090690
This paper studies situations in which a project consisting of several activities is not executed as planned.It is divided into three parts.The first part analyzes the case where the activities may be delayed; this possibly induces a delay on the project as a whole with additional costs.Associated...
Persistent link: https://www.econbiz.de/10011091937
In a proportionate flow shop problem several jobs have to be processed through a fixed sequence of machines and the processing time of each job is equal on all machines.By identifying jobs with agents, whose costs linearly depend on the completion time of their jobs, and assuming an initial...
Persistent link: https://www.econbiz.de/10011091972