Showing 1 - 10 of 28
In a mixed-model assembly line dierent models of a common base product can be manufactured in intermixed production sequences. A famous solution approach for the resulting short-term sequencing problem is the so called level scheduling problem, which aims at evenly smoothing the material...
Persistent link: https://www.econbiz.de/10005835230
In spite of extraordinary support programs initiated by the European Union and other national authorities, the percentage of overall freight traffic moved by train is in steady decline. This development is driven by the fact that macro-economic benefits of rail traffic, such as relief of...
Persistent link: https://www.econbiz.de/10008794643
This paper studies a new class of single-machine scheduling problems, that are faced by Just-in-Time-suppliers satisfying a given demand. In these models the processing of jobs leads to a release of a predefined number of product units into inventory. Consumption is triggered by predetermined...
Persistent link: https://www.econbiz.de/10008839185
In modern rail-rail transshipment yards huge gantry cranes spanning all railway tracks allow for an efficent transshipment of containers between different freight trains. This way, multiple trains loaded with cargo for varying destinations can be consolidated to a reduced number of homogeneous...
Persistent link: https://www.econbiz.de/10008633336
A mixed-model assembly line enables the joint production of dierent models of a common base product in intermixed model sequence (lot size one). Previous approaches for the short-term planning task of model sequencing either aim at minimizing work overload (mixed-model sequencing and car...
Persistent link: https://www.econbiz.de/10005785951
A mixed-model assembly line requires the solution of a short-term sequencing problem which decides on the succession of different models launched down the line. A famous solution approach stemming from the Toyota Production System is the so called Level Scheduling, which aims at distributing the...
Persistent link: https://www.econbiz.de/10005785957
At cross docking terminals, shipments from inbound trucks are unloaded, sorted and moved to dispatch points where they are directly loaded onto outbound trucks for an immediate delivery elsewhere in the distribution system. This warehouse management concept aims at realizing economies in...
Persistent link: https://www.econbiz.de/10005785961
Assembly line balancing problems (ALBPs) arise whenever an assembly line is configured, redesigned or adjusted. An ALBP consists of distributing the total workload for manufacturing products among the work stations along the line. On the one hand, research has focussed on developing effective...
Persistent link: https://www.econbiz.de/10005785965
Scheduling landings of aircrafts is an essential problem which is continuously solved as part of the daily operations of an airport control tower. All planes in the airspace of an airport are to be assigned to landing slots by the responsible air-traffic controller. The support of this decision...
Persistent link: https://www.econbiz.de/10005785968
In many industries mixed-model assembly systems are increasingly supplied out of third-party consignment stock. This novel trend gives rise to a new short-term sequencing problem which decides on the succession of models launched down the line and aims at minimizing the cost of in-process...
Persistent link: https://www.econbiz.de/10005785970