Showing 1 - 10 of 16
In this paper we introduce the problem of shunting passenger train units in a railway station. Shunting occurs whenever train units are temporarily not necessary to operate a given timetable. We discuss several aspects of this problem and focus on two subproblems. We propose mathematical models...
Persistent link: https://www.econbiz.de/10005288619
The roster planning process at the Dutch security firm NVD was traditionally carried out by hand. A few years NVD was traditionally carried out by hand. A few years ago, because of changing labor laws in the Netherlands, this became practically impossible. We developed a decision support system...
Persistent link: https://www.econbiz.de/10008584847
This paper presents a dynamic approach to the vehicle scheduling problem. We discuss the potential benefit of our approach compared to the traditional one, where the vehicle scheduling problem is solved only once for a whole period and the travel times are assumed to be fixed. In our dynamic...
Persistent link: https://www.econbiz.de/10005288342
The roster planning process at the Dutch security firm NVD was traditionally carried out by hand. A few years ago, because of changing labor laws in The Netherlands, this became practically impossible. We developed a decision support system which has four main modules. The first one checks given...
Persistent link: https://www.econbiz.de/10005288393
This paper deals with models, relaxations and algorithms for an integrated approach to vehicle and crew scheduling. We discuss potential benefits of integration and provide an overview of the literature, which considers mainly partial integration. Our approach is new in the sense that we can...
Persistent link: https://www.econbiz.de/10005288691
This paper deals with a practical application of an integrated approach to vehicle and crew scheduling, that we have developed previously. Computational results have shown that our approach can be applied to problems of practical size. However, application of the approach to the actual problems...
Persistent link: https://www.econbiz.de/10005288726
In this paper the problem of scheduling train crew is considered. We discuss a general framework of which the method for solving the train crew scheduling problem is a special case. In particular, our method is a heuristic branch-and-price algorithm suitable for large scale crew scheduling...
Persistent link: https://www.econbiz.de/10008584677
In this paper we propose a Branch and Price algorithm for solving multi-period single-sourcing problems. In particular, we generalize a Branch and Price algorithm that was developed for the Generalized Assignment Problem (GAP) to a class of convex assignment problems. We then identify an...
Persistent link: https://www.econbiz.de/10008584627
Vehicle scheduling is the process of assigning vehicles to a set of predetermined trips with fixed starting and ending times, while minimizing capital and operating costs. This paper considers the polynomially solvable case in which there is a single depot and one type of vehicle. Several...
Persistent link: https://www.econbiz.de/10008584683
This paper presents two different models and algorithms for integrated vehicle and crew scheduling in the multiple-depot case. The algorithms are both based on a combination of column generation and Lagrangian relaxation. Furthermore, we compare those integrated approaches with each other and...
Persistent link: https://www.econbiz.de/10004991111