Showing 1 - 10 of 37
This contribution presents a simulation model that generates arrivals of ships over time at a container terminal. The … in scenarios for expected future workloads. We outline the concept for a simple and generic simulation model and present …
Persistent link: https://www.econbiz.de/10008698764
algorithm that computes scenarios on the basis of these parameters. The scenarios can be used as input data for simulation … logistics such as berth planning and crane scheduling. The generator discussed here has been developed within the simulation …
Persistent link: https://www.econbiz.de/10011558784
algorithm that computes scenarios on the basis of these parameters. The scenarios can be used as input data for simulation … logistics such as berth planning and crane scheduling. The generator discussed here has been developed within the simulation …
Persistent link: https://www.econbiz.de/10011725600
Persistent link: https://www.econbiz.de/10000620290
Persistent link: https://www.econbiz.de/10000621528
Persistent link: https://www.econbiz.de/10003996698
The resource-constrained project scheduling problem (RCPSP) consists of activities that must be scheduled subject to precedence and resource constraints such that the makespan is minimized. It has become a well-known standard problem in the context of project scheduling which has attracted...
Persistent link: https://www.econbiz.de/10008992371
This paper discusses an extension of the classical resource-constrained project scheduling problem (RCPSP) in which the resource availability as well as the resource request of the activities may change from period to period. While the applicability of this extension should be obvious, we...
Persistent link: https://www.econbiz.de/10008937594
Persistent link: https://www.econbiz.de/10001224049
Persistent link: https://www.econbiz.de/10001404862