Showing 1 - 10 of 17
In the oil industry, different oil components are blended in a refinery to fuel products. These products are transported to different harbors by ship. Due to the limited storage capacity at the harbors and the undesirability of a stock-out, inventory levels at the harbors have to be taken into...
Persistent link: https://www.econbiz.de/10011149242
Persistent link: https://www.econbiz.de/10010359785
__Abstract__ We investigate to what degree we can integrate a Train Timetabling / Engine Scheduling Problem with a Crew Scheduling Problem. In the Timetabling Problem we design a timetable for the desired lines by fixing the departure and arrival times. Also, we allocate time-slots in the...
Persistent link: https://www.econbiz.de/10011149291
Persistent link: https://www.econbiz.de/10011521956
Persistent link: https://www.econbiz.de/10012242891
Persistent link: https://www.econbiz.de/10012595718
In this paper we introduce the problem of shunting passenger train units in a railway station. Shunting occurs whenever train units are temporarily not necessary to operate a given timetable. We discuss several aspects of this problem and focus on two subproblems. We propose mathematical models...
Persistent link: https://www.econbiz.de/10010837599
Although the possibility to combine column generation and Lagrangian relaxation has been known for quite some time, it has only recently been exploited in algorithms. In this paper, we discuss ways of combining these techniques. We focus on solving the LP relaxation of the Dantzig-Wolfe master...
Persistent link: https://www.econbiz.de/10010837615
This paper deals with models, relaxations and algorithms for an integrated approach to vehicle and crew scheduling. We discuss potential benefits of integration and provide an overview of the literature, which considers mainly partial integration. Our approach is new in the sense that we can...
Persistent link: https://www.econbiz.de/10010837617
When tracks are out of service for maintenance during a certain period, trains cannot be operated on those tracks. This leads to a modified timetable, and results in infeasible rolling stock and crew schedules. Therefore, these schedules need to be repaired. The topic of this paper is the...
Persistent link: https://www.econbiz.de/10010837940