Showing 1 - 1 of 1
This study deals with the scheduling problem to minimize makespan at a wet clean station in semiconductor fabrication. The wet clean station is comprised of sequential chemical and rinsing baths for cleaning wafer lots and multiple robot arms for lot handling. In the station, wafer lots are...
Persistent link: https://www.econbiz.de/10014361211