The motivation of this paper is to introduce a short term adaptive model (Partial Swarm Optimizer combined with linear and nonlinear models when applied to the task of forecasting and trading the daily closing returns of the FTSE100 exchange traded funds (ETFs). This is done by benchmarking its...
Persistent link: https://www.econbiz.de/10011573208
Persistent link: https://www.econbiz.de/10011715329
We study the problem of determining both the structure and the schedule of projects subject to capacity constraints. We assume that those projects are flexible in the sense that the activities to be implemented are not entirely known in advance. In such a setting, decisions must be made with...
Persistent link: https://www.econbiz.de/10011252681
We study the problem of determining both the structure and the schedule of projects subject to capacity constraints. We assume that those projects are flexible in the sense that the activities to be implemented are not entirely known in advance. In such a setting, decisions must be made with...
Persistent link: https://www.econbiz.de/10011324714
In this paper we present a genetic algorithm for the multi-mode resource-constrained project scheduling problem (MRCPSP), in which multiple execution modes are available for each of the activities of the project. In contrast to a conventional genetic algorithm, we apply a bi-population genetic...
Persistent link: https://www.econbiz.de/10004983014
Persistent link: https://www.econbiz.de/10011757253
We study the problem of determining both the structure and the schedule of projects subject to capacity constraints. We assume that those projects are flexible in the sense that the activities to be implemented are not entirely known in advance. In such a setting, decisions must be made with...
Persistent link: https://www.econbiz.de/10010531358
Persistent link: https://www.econbiz.de/10011676028