We study the problem of determining both the structure and the schedule of projects subject to capacity constraints. We assume that those projects are flexible in the sense that the activities to be implemented are not entirely known in advance. In such a setting, decisions must be made with...
Persistent link: https://www.econbiz.de/10011252681
We study the problem of determining both the structure and the schedule of projects subject to capacity constraints. We assume that those projects are flexible in the sense that the activities to be implemented are not entirely known in advance. In such a setting, decisions must be made with...
Persistent link: https://www.econbiz.de/10011324714
In this paper we present a genetic algorithm for the multi-mode resource-constrained project scheduling problem (MRCPSP), in which multiple execution modes are available for each of the activities of the project. In contrast to a conventional genetic algorithm, we apply a bi-population genetic...
Persistent link: https://www.econbiz.de/10004983014
We study the problem of determining both the structure and the schedule of projects subject to capacity constraints. We assume that those projects are flexible in the sense that the activities to be implemented are not entirely known in advance. In such a setting, decisions must be made with...
Persistent link: https://www.econbiz.de/10010531358
Persistent link: https://www.econbiz.de/10011676028