Showing 1 - 10 of 48
Persistent link: https://www.econbiz.de/10001546856
Persistent link: https://www.econbiz.de/10001477524
Persistent link: https://www.econbiz.de/10001369769
feasible sequences are provided. Second, an algorithm is presented which can optimize a level scheduling objective while taking …
Persistent link: https://www.econbiz.de/10011734528
While balancing straight assembly lines is a well-studied problem, the Situation where the assembly line has a U-shaped Iayout is a still emerging research field. The advantage of these lines is that workers may simply turn around to operate at two legs of the line. Hence, there is an additional...
Persistent link: https://www.econbiz.de/10011734653
Gegenstand der vorliegenden Arbeit sind zwei praktisch und theoretisch bedeutsame Probleme, die bei just-in-time orientierter Variantenfließfertigung auftreten. Ein Problem besteht darin, den Teilebedarf in der Endmontage so konstant wie möglich zu halten ("Level Scheduling Problem"). Das...
Persistent link: https://www.econbiz.de/10011735059
Persistent link: https://www.econbiz.de/10001432807
Persistent link: https://www.econbiz.de/10001247191
Persistent link: https://www.econbiz.de/10001566590