Showing 1 - 10 of 14
This note formulates an assignment problem for obtaining optimal level schedules for mixed-model assembly lines in JIT production systems. The problem was formulated as a quadratic integer programming problem in a recent paper by Miltenburg (1989) where, however, only enumerative algorithms and...
Persistent link: https://www.econbiz.de/10009209084
Persistent link: https://www.econbiz.de/10001149122
Persistent link: https://www.econbiz.de/10008699007
Persistent link: https://www.econbiz.de/10009717291
Persistent link: https://www.econbiz.de/10003747853
This note formulates an assignment problem for obtaining optimal level schedules for mixed-model assembly lines in JIT production systems. The problem was formulated as a quadratic integer programming problem in a recent paper by Miltenburg (1989) where, however, only enumerative algorithms and...
Persistent link: https://www.econbiz.de/10012746783
Flexible transfer lines or mixed-model assembly lines are capable of diversified small-lot production due to negligible switch-over costs. With these lines, it is possible to implement just-in-time (JIT) production, which involves producing only the necessary parts in the necessary quantities at...
Persistent link: https://www.econbiz.de/10014047542
The recently introduced response time variability problem (RTVP) is a scheduling problem that has a broad range of real …
Persistent link: https://www.econbiz.de/10010667495
The problem of scheduling identical jobs with chain precedence constraints on two uniform machines is considered. It is …
Persistent link: https://www.econbiz.de/10010847645
The problem of scheduling identical jobs with chain precedence constraints on two uniform machines is considered. It is …
Persistent link: https://www.econbiz.de/10010950064