Showing 1 - 3 of 3
This study is motivated by a process-reengineering problem in personal computer (PC) manufacturing, i.e., to move from a build-to-stock operation that is centered around end-product inventory towards a configure-to-order (CTO) operation that eliminates endproduct inventory. In fact, CTO has made...
Persistent link: https://www.econbiz.de/10009218511
Persistent link: https://www.econbiz.de/10006512088
Persistent link: https://www.econbiz.de/10006289369