Showing 1 - 10 of 132
Persistent link: https://www.econbiz.de/10009705951
In this paper we study the economic feasibility of constructing a 560 MW coal-fired power plant in Turkey, using real options theory. We start from a short review of the Turkish electricity market as well as the literature on real options theory and power plant investment. We then investigate...
Persistent link: https://www.econbiz.de/10013092667
Persistent link: https://www.econbiz.de/10011952686
Persistent link: https://www.econbiz.de/10011952687
Persistent link: https://www.econbiz.de/10009574190
, irrespective of the fact that the specific risk strongly varies with the technology concerned and also over time. In order to …
Persistent link: https://www.econbiz.de/10013103556
Persistent link: https://www.econbiz.de/10011732604
character of wind and solar power, as well as the optimal investment timing under uncertainty. In fact, many uncertainties arise … optimal size of the storage device. Monte Carlo simulation is performed to analyze the following sources of uncertainty: (i …
Persistent link: https://www.econbiz.de/10012947516
, we aim to determine the optimal timing for the shut-down of unprofitable gas-fired power plants as well as the … operation, or the optimal timing for shutdown of the power plant, depend strongly on the volatility level of the capacity factor …
Persistent link: https://www.econbiz.de/10014109323
Persistent link: https://www.econbiz.de/10011895552