Showing 1 - 8 of 8
This summary report incorporates into a single document the design, construction, and performance data for the I-710 Freeway Rehabilitation Project in Long Beach, California. Included are the following: summaries of the asphalt mix and structural pavement section designs; construction sequence...
Persistent link: https://www.econbiz.de/10010677481
Caltrans is in the process of implementing Mechanistic-Empirical design procedures. All mechanisticempirical methods must be validated/calibrated against the behavior of real pavements. This should be done before implementing models in design methods to ensure that designs will be reasonable....
Persistent link: https://www.econbiz.de/10010677497
This report summarizes a series of eight first-level Heavy Vehicle Simulator testing reports, two laboratory reports on shear and fatigue testing, a forensic investigation report, a report on the backcalculation of deflection measurements, and a second-level analysis report, all of which...
Persistent link: https://www.econbiz.de/10010677542
This report contains a summary of the laboratory fatigue tests on mixes used as overlays on the Reflective Cracking Study Test Track at the Richmond Field Station. Evaluation of the results of the laboratory study on fatigue response of the overlay mixes reported herein included the effects of...
Persistent link: https://www.econbiz.de/10010677608
This report contains a summary of the laboratory repeated load shear tests on mixes used as overlays on the Reflective Cracking Study Test Track at the Richmond Field Station. Evaluation of the results of the laboratory study on shear response of the overlay mixes reported herein included the...
Persistent link: https://www.econbiz.de/10010677675
This report follows a series of seven first-level Heavy Vehicle Simulator (HVS) testing reports, two laboratory reports on shear and fatigue testing, a forensic investigation report, and a report on the backcalculation of deflection measurements, all of which document an investigation undertaken...
Persistent link: https://www.econbiz.de/10010677686
This report provides a summary of the results of the various studies completed in the Partnered Pavement Research Program (PPRC) during the period 2000–2004. In addition, preliminary findings of investigations, initiated but not yet implemented during this period, are included. The...
Persistent link: https://www.econbiz.de/10011131208
The California Department of Transportation (Caltrans) replaced about 5 kilometers (total 20 lane-kilometers) of concrete pavement on Interstate 15 in Devore, California. The I-15 Devore II rehabilitation project was completed in six weekend closures with around-the-clock construction in early...
Persistent link: https://www.econbiz.de/10011131218