Showing 1 - 10 of 38
The decision whether to use all the available machines in the shop becomes very relevant when the capacity exceeds the demand. In such cases, it might be optimal to use only a subset of the machines. We study this option in a two-stage flowshop environment. Jobs are assumed to be identical, and...
Persistent link: https://www.econbiz.de/10010869075
A scheduling problem with a common due-window, earliness and tardiness costs, and identical processing time jobs is …
Persistent link: https://www.econbiz.de/10010664723
The majority of the papers dealing with scheduling deteriorating jobs ignores general deterioration forms, and …
Persistent link: https://www.econbiz.de/10010597239
We study a due-window assignment problem on a single machine. The job-dependent due-windows are obtained by the common flow allowance criterion. The scheduler has the option to perform a maintenance activity which is rate modifying, i.e., improves the processing times of the following jobs. We...
Persistent link: https://www.econbiz.de/10010597247
Persistent link: https://www.econbiz.de/10011417421
Persistent link: https://www.econbiz.de/10011417482
Persistent link: https://www.econbiz.de/10011420688
Persistent link: https://www.econbiz.de/10011502613
Persistent link: https://www.econbiz.de/10011508904
Persistent link: https://www.econbiz.de/10010221651