Showing 1 - 10 of 22
Persistent link: https://www.econbiz.de/10014456201
Persistent link: https://www.econbiz.de/10003729993
Persistent link: https://www.econbiz.de/10003730037
Persistent link: https://www.econbiz.de/10003884696
This paper deals with the generalized resource-constrained project scheduling problem (GRCPSP) which extends the well …-known resource-constrained project scheduling problem (RCPSP) by considering job specific release and due dates, non-negative minimum …
Persistent link: https://www.econbiz.de/10010847827
This paper deals with the generalized resource-constrained project scheduling problem (GRCPSP) which extends the well …-known resource-constrained project scheduling problem (RCPSP) by considering job specific release and due dates, non-negative minimum …
Persistent link: https://www.econbiz.de/10010950224
Main description: Nach einer knappen Zusammenfassung graphentheoretischer Definitionen folgen eine allgemeine Darstellung des Prinzips und der Komponenten von Branch-and-Bound-Verfahren sowie prinzipieller Vorgehensweisen von Heuristiken. Kapitel 2 stellt mit der Behandlung von nichtlinearen...
Persistent link: https://www.econbiz.de/10014508770
The mixed-model sequencing problem is to sequence different product models launched down an assembly line, so that work overload at the stations induced by direct succession of multiple labour-intensive models is avoided. As a concept of clearing overload situations, especially applied by...
Persistent link: https://www.econbiz.de/10008568613
Persistent link: https://www.econbiz.de/10003933051
-called Level Scheduling (LS), which aims to distribute the part consumption in-duced by a model sequence evenly over the planning …
Persistent link: https://www.econbiz.de/10005870689